Antialergic Houses

Over 12 million UK citizens  are allergic to their homes

Cases of chronic rhinitis in the British are becoming more frequent, according to data from the UK National Health Service. A survey carried out among residents of the island shows that 58% of them have a house dust allergy, 45% for domestic animals and 31% for mold. Also, one-third of respondents state that cleaning preparations cause an allergic reaction.

The number of "victims" increases in the winter months as central heating helps to collect more dust.

Bed in the bedroom is one of the biggest sources of allergies. The pillow, for example, should be replaced in half a year. If longer time is used, the number of acarids increases twice.

The anti-allergic houses that we offer will have a quality certificate issued by ECARF (European Center for Allergy Research).

During the construction of BC Anti-allergic Homes are using non-toxic materials, and interior wood pine and pine paneling and cladding. They are known for their soothing properties.

After the construction of such a house, it is recommended that the residents also do not live together with their pets.

The anti-allergic houses of BC are made of materials that do not pollute the environment.

There are several factors that distinguish anti-allergic buildings built by BC and other eco-properties. The first is that biologists are required to take part in the construction phase to control the quality and the way the materials are laid in the finished walls and elements. The other is that people often suffer from allergies, chronic and oncological diseases in these properties.

The only similar house in Spain to date is located in Miraflores de la Sierra (Madrid). The items were made in Erkheim and delivered to the Spanish capital with the help of several trucks. The architectural design was done by the Madrid Bureau Hollegha Arquitectos.

Each house is built on an individual project. The assembling of the individual parts takes up to 4 weeks before the basics are laid. More is the preparatory stage. The very fabrication of the elements is about 12 to 16 weeks. The period for obtaining the relevant permits is twice smaller.

The base of the panels is a 20 cm sandwich with a steel galvanized base. The inner part has a special insulation system. Toxic substances in the panels are not used.

The house in Madrid has a built-up area of ​​265 sq.m. It has natural ventilation and particle filtering systems. Depending on the types of materials used, the price per square meter varies between 200 pounds / sq. Ft. up to 300 pounds / sq. ft.