Ready for finishing house

You want to partly complete the interior construction work yourself?

With the flooring and electrical, sanitary and heating installation construction stage, you allow our experts to complete these important tasks. You can then finish off the remainder of the work as you wish in line with your possibilities. Therefore, in addition to the services provided with the bare bones house, you also receive the flooring, the electrical installations with distribution panel (without meter box), switches and sockets, as well as the sanitation piping for cold and hot water and the appropriate drainage.

Electrical installations

The complete electrical installations pursuant to ÖVE directives from the meter fuse box or distribution panel in the house. E-systems with RCCB and eight electrical circuits, included automatic fuses. One light outlet and three switches or sockets per room (kitchen and living/dining room count double).

Flooring construction

Modern steel construction, 150mm insulation and 2cm footfall insulation. A OSB layer is applied on top with expansion strips as the sub-layer for the floorings.

Sanitation pipe installation

The installations for hot- and cold-water connections and drainage, as well as the mounting frames for suspended WC units are provided for the sanitation systems drawn on the ground plan.

Heating and hot water system

Boiler is installed. The chimney and exhaust gas, intake air system is not included. Naturally, other forms of heating are available but at additional charge.

Special requests

Supplementary services can be offered and supplied at the request of the client.